Font size: A A A A
Home > Supplier Information > Air Travel
Related topics: Air Travel,upgrades
Font size: A A A A

San Jose Del Cabo Airport to Undergo Upgrades

June 21, 2007 By: Joe Pike Travel Agent

Planned upgrades will include facility enhancements to ensure visitors' comfort and ease of travel upon arrival and/or departure in keeping with the destination's upscale appeal, a release stated. The airport development will include the addition of a Fixed Base Operation Center offering upgraded travel services, a new fourth terminal building, a complete remodeling of Terminal 3, the addition of parallel landing strips for quicker departures and the institution of new highway administration for improved airport access and parking. The Fixed Base Operation Center is slated to begin construction in August 2007 and set for completion in March 2008. Construction on the new terminal is set to begin in November 2007, with completion slated for December of 2009. Terminal 3 will be fully remodeled and integrated into the new Terminal 4 beginning in March 2010. Other principal areas of development include a main terminal area, arrival terminal, documentation area, baggage claim and commercial area.

What do you think of this $type?

This comprehensive guide begins at Alfava Metraxis and ends at Doctor Who Magazine wins the ACE Press Award 0 Following its record breaking ABC figure earlier this year, Doctor Who Magazine had cause for further celebration at the 2014 ACE Press Awards held viagra bedeutung online apotheke at the Museum of London. This may take a second or two.